Sample: OECD Governance: Infrastructure planning and delivery indexes - government at a glance indicators, 2025 edition
Free preview (100 rows). Same data as
GET /api/datasets/dsd-gov-df-gov-infpd-2025/sample.
governance
Preview
| action | freq | frequency_of_observation | ref_area | reference_area | measure_code | measure_name | unit_measure | unit_of_measure | sector | institutional_sector | edition_code | edition_name | category_code | category_name | year | time_period | value | observation_value | obs_status | observation_status | unit_mult | unit_multiplier | price_base_code | price_base_name | base_per | base_period |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| I | A | Annual | AUS | Australia | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.17 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | AUS | Australia | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.18 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | AUS | Australia | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.63 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | AUS | Australia | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.23 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | AUS | Australia | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.06 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | AUT | Austria | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.25 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | AUT | Austria | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.11 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | AUT | Austria | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.79 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | AUT | Austria | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.23 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | AUT | Austria | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.21 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | BEL | Belgium | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.08 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | BEL | Belgium | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.49 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | BEL | Belgium | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.18 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | BEL | Belgium | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.08 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | BEL | Belgium | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.15 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CAN | Canada | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.23 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CAN | Canada | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.18 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CAN | Canada | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.17 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CHL | Chile | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.08 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CHL | Chile | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.09 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CHL | Chile | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.03 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CHL | Chile | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.13 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CHL | Chile | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.33 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | COL | Colombia | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.17 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | COL | Colombia | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.13 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | COL | Colombia | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.65 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | COL | Colombia | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.14 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | COL | Colombia | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.22 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CRI | Costa Rica | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.2 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CRI | Costa Rica | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.17 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CRI | Costa Rica | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.2 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CRI | Costa Rica | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.71 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CRI | Costa Rica | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.14 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CZE | Czechia | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.05 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CZE | Czechia | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.19 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CZE | Czechia | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.0 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CZE | Czechia | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.41 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | CZE | Czechia | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.17 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | EST | Estonia | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.11 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | EST | Estonia | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.13 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | EST | Estonia | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.61 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | EST | Estonia | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.18 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | EST | Estonia | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.2 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | FIN | Finland | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.25 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | FIN | Finland | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.14 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | FIN | Finland | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.16 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | FIN | Finland | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.73 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | FIN | Finland | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.18 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | FRA | France | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.0 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | FRA | France | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.13 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | FRA | France | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.04 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | FRA | France | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.33 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | FRA | France | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.16 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | DEU | Germany | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.18 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | DEU | Germany | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.52 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | DEU | Germany | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.03 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | DEU | Germany | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.08 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | DEU | Germany | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.23 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | ISL | Iceland | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.15 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | ISL | Iceland | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.25 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | ISL | Iceland | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.18 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | ISL | Iceland | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.6 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | ISL | Iceland | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.03 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | IRL | Ireland | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.11 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | IRL | Ireland | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.16 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | IRL | Ireland | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.56 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | IRL | Ireland | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.2 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | IRL | Ireland | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.08 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | ITA | Italy | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.2 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | ITA | Italy | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.23 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | ITA | Italy | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.25 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | ITA | Italy | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.14 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | ITA | Italy | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.82 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | KOR | Korea | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.25 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | KOR | Korea | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.25 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | KOR | Korea | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.25 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | KOR | Korea | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.19 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | KOR | Korea | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.94 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | LVA | Latvia | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.19 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | LVA | Latvia | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.85 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | LVA | Latvia | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.25 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | LVA | Latvia | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.18 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | LVA | Latvia | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.23 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | LTU | Lithuania | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.13 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | LTU | Lithuania | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.2 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | LTU | Lithuania | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.14 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | LTU | Lithuania | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.67 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | LTU | Lithuania | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.2 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | MEX | Mexico | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.25 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | MEX | Mexico | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.25 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | MEX | Mexico | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.22 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | MEX | Mexico | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.93 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | MEX | Mexico | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.21 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | NZL | New Zealand | EIDMT_IM | Evidence for infrastructure management | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.15 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | NZL | New Zealand | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.48 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | NZL | New Zealand | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.13 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | NZL | New Zealand | EIDMT_PAIA | Use of data for project appraisal and impact analysis | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.2 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | NZL | New Zealand | EIDMT_PP | Use of evidence during the procurement process | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.0 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | NOR | Norway | EIDMT | Evidence informed infrastructure decision making in the transport sector | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.59 | A | Normal value | 0 | Units | _Z | Not applicable | ||||
| I | A | Annual | NOR | Norway | EIDMT_SP | Evidence for strategic planning | IX | Index | _Z | Not applicable | 2025 | 2025 | INFPD | Infrastructure planning and delivery | 2022 | 0.17 | A | Normal value | 0 | Units | _Z | Not applicable |